Intersection Improvement S-908 / L-745

Driving can be a daunting task, especially when you encounter intersections that aren’t well-designed. That’s why intersection improvement projects are vital to ensuring the safety and efficiency of our roadways. One such project is the S-908 (Gap Creek Road) / L-745 (Gary Armstrong/Hampton Rd) intersection improvement initiative. This project aims to address the long-standing issues with the current design of the intersection, including limited sightlines and ineffective traffic flow. By improving these aspects, the project will not only enhance safety on the road but also reduce congestion and travel time for drivers. This is a much-needed development that will make a significant difference for drivers in the area. In this article, we’ll take a closer look at the S-908/L-745 intersection improvement project, its objectives, and the benefits it will bring to the community.

 

Background on S-908 (Gap Creek Road) and L-745 (Gary Armstrong/Hampton Rd)

S-908 (Gap Creek Road) and L-745 (Gary Armstrong/Hampton Rd) are two busy roads located in the city. The intersection of these two roads has been a cause of concern for drivers. The limited sightlines and ineffective traffic flow have led to several accidents and traffic congestion. The intersection is also an important route for emergency services, school buses, and pedestrians.

The South Carolina Department of Transportation (SCDOT) has recognized the need for intersection improvement and has undertaken an initiative to address the issues with the current design. The project will involve significant changes to the intersection, including roadway widening, improved traffic control devices, and better pedestrian facilities.

 

Issues With the Previous Intersection Design

The previous intersection design had several issues that made it unsafe and inefficient for drivers. One of the primary issues was the limited sightlines. Drivers turning into the intersection had to rely on the traffic coming from the left or right, which could be difficult to see due to the curvature of the road. This led to several accidents, particularly during peak traffic hours.

Another issue with the previous design was the ineffective traffic flow. The intersection was not designed to handle the high volume of traffic that passed through it on a daily basis. This led to congestion and delays, particularly during rush hour. The intersection also lacked dedicated turn lanes.

 

The Proposed Intersection Improvements and Design Changes

The SCDOT has proposed several improvements to the intersection that aim to address the issues with the previous design. The primary objective of the project is to improve safety for drivers, pedestrians, and cyclists. The proposed improvements include:

  • Widening of the roadway to provide dedicated turn lanes.
  • Installation of modern traffic control devices, such as signals and signs.
  • Improved pedestrian facilities, including crosswalks and sidewalks.
  • Realignment of the intersection to improve sightlines and reduce the curvature of the road.

The SCDOT has also stated that the new intersection design will be optimized for better traffic flow, reducing congestion and travel time for drivers. The proposed changes have been designed with input from traffic engineers, safety experts, and the public.

The new intersection design will bring several benefits to the community. The primary benefit is improved safety for drivers, pedestrians, and cyclists. The wider roadway and dedicated turn lanes will reduce the risk of accidents, while the improved traffic control devices will help to manage traffic flow more efficiently.

The project will also reduce congestion and travel time for drivers, particularly during peak traffic hours. This will improve the overall quality of life for residents in the area by reducing the time they spend on the road.

In addition, the improved pedestrian facilities will make it safer and easier for pedestrians to cross the road.